Structure / Construction With Material Packages

STANDARD

1000/*-Sq Ft

PREMIUM

1100/*-Sq Ft

LUXURY

1350/*-Sq Ft

Design
  • Site Layout Plan
  • 2D/3D Layout
  • Steel – Fe- 5000D (Kedar , Tehri gold, or equivalent)8.MM/10MM/12MM
  • Depth of the foundation 5 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 2.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • Main Door Frame – Sal wood frame of 5 inch by 3 inch.
  • Internal Doors Frame –  Door Frames of Apolo 
  • Windows frame – (Apollo) iron frame with  Windows.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Depth of the foundation more than 5’ feet will be charged additional
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra
Design
  • Site Layout Plan
  • 2D/3D Layout
  • Steel – Fe- 500D (TATA or equivalent)8.MM/10MM/12MM
  • Depth of the foundation 5 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 2.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • All Door Frame – Sal wood frame of 5 inch by 3 inch.
  • All Windows frame – Sal wood frame of 5 inch by 3 inch.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Depth of the foundation more than 5’ feet will be charged additional
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra
Design
  • Site Layout Plan
  • Structure drawing
  • 2D/3D Layout
  • Steel – Fe- 5000D (Kedar , Tehri gold, or equivalent)8.MM/10MM/12MM
  • Depth of the foundation 5 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 2.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • All Door Frame – Sal wood frame of 5 inch by 3 inch.
  • All Windows frame – Sal wood frame of 5 inch by 3 inch.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra

Fill The Form To View Packages

Fill The Form To View Packages

Fill The Form To View Packages

Fill The Form To View Packages

Fill The Form To View Packages