MON - FRI 8AM - 5PM
+91-8979301078

Structure / Construction With Material Packages

STANDARD
950/*-Sq Ft

  • Site Layout Plan
  • 2D/3D Layout
  • Steel – Fe- 500D (Kedar , Tehri gold, or equivalent)8.MM/10MM/12MM
  • Depth of the foundation 5 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 3.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • Main Door Frame – Sal wood frame of 5 inch by 3 inch.
  • Internal Doors Frame –  Door Frames of Apolo 
  • Windows frame – (Apollo) iron frame with  Windows.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Depth of the foundation more than 5’ feet will be charged additional
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra

PREMIUM
1100/*-Sq Ft

  • Site Layout Plan
  • 2D/3D Layout
  • Steel – Fe- 500D (TATA or equivalent)8.MM/10MM/12MM
  • Depth of the foundation 5 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 3.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • All Door Frame – Sal wood frame of 5 inch by 3 inch.
  • All Windows frame – Sal wood frame of 5 inch by 3 inch.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Depth of the foundation more than 5’ feet will be charged additional
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra

LUXURY
1300/*-Sq Ft

  • Site Layout Plan
  • Structure drawing
  • 2D/3D Layout
  • Steel – Fe- 500D (TATA or equivalent)8.MM/10MM/12MM/16MM
  • Depth of the foundation 6 structural designer’s recommendation
  • Red Bricks – First Class brick
  • Structure Foundation- As per the structural designer’s recommendation. (Isolated footings )
  • Eccentric footing will be structural designer’s recommendation
  • Cement – ACC, Ultratech or CCI equivalent. (PPC & OPC).
  • M7.5/M10/M15/M20 As per the structural designer’s recommendation.
  • ( Specifications for Design of footings as per IS 456: 2000)
  • Aggregates – 20mm & 40mm (Ponta Sahib)
  • Sand/Dust for Brickwork.
  • M Sand For Plastering.
  • RCC Design Mix – As per the structural designer’s recommendation.
  • foundation filling 3.5FT
  • Dr.Fixit or Asian Paint Waterproofing.
  • Ceiling Height – 10 to 11 feet (Finished Floor level to Finished Floor level).
  • Slab thickness more than 5” will be charged extra
  • Using Cover Blocks & Ant termite.
  • Staircase 
  • Front elevation 
  • T angle- 2
  • Tank Stand
  • Slab work as Per Customer Requirement
  • CPVC/ PVC Pipe – Finolex and Paras or equivalent.
  • CPVC/ PVC  Pipe –  Finolex and Paras As Per Customer Requirement
  • Waterproofing –  Asian Paint Waterproofing.
  • All Door Frame – Sal wood frame of 5 inch by 3 inch.
  • All Windows frame – Sal wood frame of 5 inch by 3 inch.
  • PPC
  • Pipe Fittings – Fan box Cancelled box, Pipes (Polycab / Zester Or Equivalent) 
  • TV unit point . as Per Customer Requirement.
  • Power point, Ac Point, Wifi Point, freeze point, microwave point, chimney point, geazer point. Etc…. acc to customer requirement and discussion.
  • Tapered roof area will be charged at Rs 200/sqft (If any special design)
  • Compound wall will be charged additional @ Rs 1000/Rft based on foundation depth/height 
  • Underground Sump – 4000 liters ( Depend on Space)extra charges – 850
  • All plumbing and electrical work will be done as per the drawing given by the Architect.
  • Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and finishing specifications.
  • Any other specifications not exclusively mentioned here means it is additional cost
  • Lofts will be charged extra
  • Cut lintels over doors and windows will be provided
  • Rainwater sump, Percolation pit and site cleaning will be charged extra
  • Excavation will be charged extra when encountered with water/loose soil/stone
  • Extra Reinforcement will be charged additional unless advised in the drawings
  • Wire & Switches provide by second party.
  • Cp fitting provide by second party.
  • Outside filling charges extra.
  • Govt. Taxes Extra